Abstract

We, East Japan Railway Company, have already installed three energy storage systems in d.c. railway power supply system around Tokyo area for regenerative energy utilization and are now constructing new regenerative inverter system at Tokyo Station. In this paper, advantages and disadvantages of those systems will be compared. Furthermore, the examples of load waveforms of traction power supply system and distribution line system at Kajibashi Substation will be shown to discuss feasibility of regenerative energy utilization.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.