Abstract

Numerical simulation is carried out of the group pile foundation project of the shield tunnel on Nanjing metro airport line which crossing Beijing-Shanghai high-speed railway. The paper analysed the characteristics of the horizontal displacement along bridge of the pile foundation during the whole crossing process. On this basis, the reinforcement effects of grouting reinforcement, longitudinal beam and cross bracing reinforcement, bored cast-in-place pile reinforcement are comparative analysed with the horizontal displacement alone bridge of pile as the evaluation index. Also, the feasible program of the shelter pile reinforcement could be determined by combing with the construction process and conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.