Abstract

As the most critical facility of the rail transit station, the transfer channel’s capacity and efficiency greatly affect the operational efficiency and safety of the transfer station. Due to the uncoordinated network planning and the inaccurate prediction of passenger flow, the current capacity of the transfer station at the peak of the transfer station is seriously insufficient. It is necessary to redesign and rebuild the transfer channel to meet the needs of passengers in the peak period. Taking the Zhichun Road Station of Beijing Subway as an example, this paper uses the Vissim pedestrian simulation software to establish different transfer channel reconstruction schemes due to the problems caused by insufficient capacity of the transfer channel. Based on the actual transfer and facility capabilities, comprehensive considerations are made from the transfer time, transfer distance and reconstruction costs to arrive at the best retrofit solution.CLC number: U291.69

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.