Abstract

This paper presents a comparison, analysis and power assessment of PV Roof Top System, 10 kWp single phase and 10 kWp three phase. The system was installed at Samutprakarn Province, Thailand. The monitored data had been collected for a month. This data was investigated and compared with a simulation program, Homer. From the collected data which was on April 2015, the system could produce energy from 06.00AM – 18.30PM. The total energy was 1,227 kWh and 1,301 kWh. From Homer simulation, the system results showed that the total produced energies up 1,016 kWh and 1,117 kWh which is 8% difference from the monitored data. The performance ratio (PR) is 72% and 73%, respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.