Abstract

AbstractHundreds of millions of dollars have been spent on stream restoration projects to benefit salmonids and other aquatic species across the Pacific Northwest, though only a small percentage of these projects are monitored to evaluate effectiveness and far fewer are tracked for more than 1 or 2 years. The Washington State Salmon Recovery Board and the Oregon Watershed Enhancement Board have spent more than US$500 million on salmonid habitat restoration projects since 1999. We used a multiple before‐after–control‐impact design to programmatically evaluate the reach‐scale physical and biological effectiveness of a subset of restoration actions. A total of 65 projects in six project categories (fish passage, instream habitat, riparian planting, livestock exclusion, floodplain enhancement, and habitat protection) were monitored over an 8‐year period. We conducted habitat, fish, and macroinvertebrate surveys to calculate the following indicators: longitudinal pool cross section and depth, riparian shade and cover, large woody debris volumes, fish density, macroinvertebrate indices, and upland vegetation condition class. Results indicate that four categories (instream habitat, livestock exclusions, floodplain enhancements, and riparian plantings) have shown significant improvements in physical habitat after 5 years. Abundance of juvenile Coho Salmon Oncorhynchus kisutch increased significantly at fish passage projects and floodplain enhancement projects, but significant results were not detected for other fish species. Moreover, the biological response indicators of juvenile salmonid abundance and macroinvertebrate indices showed declines at instream habitat and habitat protection projects, respectively. Our results indicate that a subset of projects can be effectively evaluated programmatically, but power and sample size estimates indicate that two or more years of preproject data are necessary to adequately determine the effectiveness of many project types, particularly for fish. Programmatic evaluations of project effectiveness should include adequate preproject sampling and multiseason monitoring for fish species to address issues of variability that are likely to be encountered in large‐scale monitoring programs.Received September 16, 2015; accepted February 7, 2016 Published online June 6, 2016

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.