Abstract

I compare the performance of solution methods in solving a standard real business cycle model with labor market search frictions. Under the conventional calibration, the model is solved by the projection method using the Chebyshev polynomials as its basis, and the perturbation methods up to third order in both levels and logs. Evaluated by two accuracy tests, the projection approximation achieves the highest degree of accuracy, closely followed by the third order perturbation in levels. Although different in accuracy, all the approximated solutions produce simulated moments similar in value.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call