Abstract
In the last years, several researchers from two different academic communities, the Operations Research and the Process Systems Engineering, have been developing mathematical formulations for the lot-sizing and scheduling of single-stage continuous processes with complex setup structures. This problem has been intensively studied due to its importance to a wide range of industries where a single-stage approach is suitable for production planning. This is the case of the glass container, beer, and dairy production. Recent works have been performed by both mentioned communities, however, no intense communication between these research efforts has been observed. This work attempts a systematic analysis on recent formulation developments of both communities. Based on the result of this comparison, a reformulation is proposed that outperforms in the majority of the cases the previous existent formulations for a set of systematically generated random instances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.