Abstract
This paper compares two methods for calculating boiler efficiency using test data obtained from the Boardman Coal Plant. The two test methods are ASME PTC 4’s Energy Balance Method as evaluated by Sargent & Lundy LLC, Chicago, IL, and the Input/Loss Method as evaluated by its owner, Exergetic System Inc., San Rafael, CA. The differences in methods are fundamental: varying in basic definitions of boiler efficiency and calculation methodology.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.