Abstract

Concrete and steel structures influences the construction of multi-storey structures. The aid of progressive collapse increases when there is a failure of one or more load bearing structural elements. Thereafter, this case study is carried out to determine the prospective of the progressive collapse of an irregular (L shaped) building due to the failure or removal of two adjacent columns at a time present in the ground floor. Failure may occur because of the natural or manmade accidental loads like explosion or seismic loads, collision of vehicles, etc. Columns at different locations were removed and the slab loads had been increased as per the General Services Administration (GSA) guidelines and the results in terms of Demand Capacity Ratios (DCR) are compared for all the cases. The Demand to Capacity Ratios were calculated for the interested columns. It is observed that when the interior columns were removed then the possibility of progressive collapse is more. This study has been made for the case or earthquake forces for corresponding zone II and zone V.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.