Abstract

The small hydropower stations on most tributaries in the middle reaches of Salween River are mostly high-head diversion hydropower stations, and the choice of hub arrangement scheme is an important content of the preliminary construction project. Taking Yamu River-I Hydropower Station as an example, this paper compares and analyzes the layout scheme of the main hub of the project from the aspects of dam site, dam type, regulation scheme, diversion route and site selection, and summarizes the optimization ideas and characteristics of the layout scheme of the main hub of the project, so as to be helpful for the preliminary design of similar hydropower stations.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.