Abstract
Abstract: In the project report, an attempt is made to design a road, based on the principles of pavement design and cost analysis of y two methods (Group Indexed and CBR Method). On the existing alignment of the road, soil samples are collected for the determination of soil characteristics like consistency limits, sieve analysis, C.B.R. values etc. Based on this the thickness of the pavement (flexible) is designed. The alignment of the road is also designed and fixed by surveying and leveling. The total road length being 497 meters of which, one section is 247m, other is 200m and the third section is 50m. The site selected for this study is of village road near Korba, Korba district of Chhattisgarh, India. Keywords: GI Method, Flexible Pavement, CBR Method, Liquid Limit Test, Plastic Limit, Standard Proctor test, OMS & MDD.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal for Research in Applied Science and Engineering Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.