Abstract

This paper presents a comparative study of methods used for the analysis of the stability of rock slopes for hydropower projects. The comparison concerns the application of the limit equilibrium method, the block element method, and the finite element method on the stability analysis of two hydropower engineering projects in China. The study results show that the limit equilibrium method and the block element method give very close result, while the finite element method gives more conservative safety factor.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.