Abstract

The Flexible AC Transmission System (FACTS) devices are being commissioned in electrical power systems across the globe owing to the vast array of benefits they offer. The optimal performance of the FACTS devices can be harnessed only if they are installed at a strategic location. In this paper, the authors suggest the merit of multiobjective cuckoo search (MOCS) algorithm in mitigation of transmission losses by strategically installing unified power flower controller (UPFC) at an optimal location. Active power loss and reactive power loss reduction is the multiobjective optimization considered for the study. The Pareto-optimal technique is employed to extract the Pareto-optimal solution for the multiobjective problem considered. The Fuzzy logic method is utilized to yield the best-compromise solution from the pool of Pareto-optimal solution. The proposed approach is tested on a standard IEEE 30 bus test system. Furthermore, the efficacy of the MOCS algorithm is demonstrated by comparing the results with that of multiobjective particle swarm optimization (MOPSO).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.