Abstract

The construction of physical infrastructure is contributory for poverty alleviation in every country. The road is one of the major components which is very significant in Ethiopia due to lack of highly developed infrastructure, particularly in the rural road sector. Selection of the appropriate road construction and maintenance methods such as labor-based method or machine-based method is necessary to be financially viable. Most rural road construction projects usually suffer from the problem of selecting the appropriate technology for the proposed project and implementation of the chosen technology. In Ethiopia, Universal Rural Road Access Program (URRAP) is an employment-intensive program for employment purpose as a first step, out of poverty using labor-based road construction. However, there are problems, constraints, and challenges encountered when implementing labor-based method leading to enforce the mobilization of machines. The aim of this research study is to carry out the comparative analysis of ongoing and finished rural road projects in Jimma Zone and to establish a qualitative and quantitative merit of various technologies used in rural road construction and maintenance. Results showed from financial cost comparison, the labor - based method was 47% cheaper than a machine-based method to carry out the same tasks. On the other hand, the share of unskilled average direct labor cost comprised of an astounding 65% more of the total direct cost of a labor-based method. Also, labor-based method directly employed 300 unskilled laborers per workday for a month to complete 1.0 km section of a rural road.

Highlights

  • The past commencements of Rural Roads Rehabilitation in Ethiopia traced back from the late 1970s onwards, and have been an important delivery mechanism for restoring access for the rural population to markets, social and other services to reduce transportation time and cost

  • Since the beginning of rehabilitating rural roads up to June 2010 different highway and road sector development programs were implemented using both labor-based and machine-based methods of rural road construction and maintenance to own a total of 127,328 kilometers of rural roads in Ethiopia

  • The respondents of the survey include three parties, i.e. Client, Contractors and Consultants involved in the rehabilitation of rural road projects; and professionals who included in the Universal Rural Road Access Program (URRAP) program of Jimma zone

Read more

Summary

Introduction

The past commencements of Rural Roads Rehabilitation in Ethiopia traced back from the late 1970s onwards, and have been an important delivery mechanism for restoring access for the rural population to markets, social and other services to reduce transportation time and cost. Road construction projects perceived as a means through which development strategies of the government are primarily intended to achieve by agricultural activities, investment projects and industrial development of the country. This scenario can only realize if there are adequate and efficient transportation networks available in every locality. In recognition of this crucial role of the road sector, various programs have been implemented to develop it. One of the programs that are being initiated by the government, Ethiopian Road Authority (ERA) is the Road Sector Development Program Four (RSDP IV)

Methods
Results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.