Abstract

One important aspect in the planning process of a project is the calculation of the volume of work or commonly known as the Bill of Quantity (BoQ). BoQ itself is a document detailing the type of work, volume and unit of measurement of all work items to be carried out to determine the final estimated value of a construction job. Calculation of the volume of work will be carried out based on the Work Plan and Conditions (RKS) and drawings that have been approved by the owner. In the construction industry, MEP or Mechanical, Electrical, and Plumbing is an important factor to realize a building or buildings whose installation system is safe and of good quality. MEP itself is the expertise to plan, design, and manage mechanical, electrical, and piping systems in a building. The actual BoQ results were 5.74% greater than the planned BoQ caused by changes in the work of installing the plumbing system. As well as the most influential factors were changes in design drawings that did not match the conditions in the field and incomplete design drawings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.