Abstract

This study intends to do architectural and structural designs of a sustainable industrial building using BIM and LEED as well as compare the LEED industrial building and non-LEED industrial building. In this scope, the additional costs related to water and energy efficient systems were analyzed to calculate the respective break-even points. Literature review and case study were performed to achieve the research objective. In the case study, a reinforced concrete industrial building was designed via Autodesk Revit 2021 considering the selected sustainability criteria under the LEED v4.1 BD+C for New Construction rating system. The LEED industrial building can fulfill 31 credits and 8 prerequisites which allow to obtain 73 points and LEED Gold certificate. The initial cost of LEED industrial building is 154.222.607 TL while the initial cost of non-LEED industrial building is 139.080.060 TL. Break-even point for the cost of energy-efficient systems utilized in the LEED industrial building is 14 years. Break-even point for the cost of water-efficient systems utilized in the LEED industrial building is 8 years. Results contribute to the architecture, engineering and construction industry and literature by providing constructive information about the design requirements and energy, water, and cost performance of the LEED industrial buildings.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call