Abstract
This study investigates the behavior of in-filled materials of profiled steel sheeting dry board (PSSDB) floor system. Two tests were conducted, namely, push-out test to know the connection stiffness and bending test on the PSSDB panel under the influence of different in-filled materials. Result of the push-out test shows that the connection stiffness of the geopolymer concrete-filled PSSDB is 331% higher than that of PSSDB that is filled with normal concrete. This connection stiffness contributed to the reduction of deflection value of 21% in the middle of the midspan for full-board geopolymer concrete in-filled panel bending test. This phenomenon triggered the increase of interaction within the composite system, making the panel that is filled with the geopolymer concrete 25% stronger than the normal concrete–filled panel.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.