Abstract

The aim of the article is to present and analyze the processes occurring as a result of installing a long flashover arrester (LFA) and a multi-chamber arrester (MCA) as overvoltage protection of power networks. The numerical models of LFA and MCA will be made in order to carry out simulations in the scope of selected structural elements of the considered overvoltage protection device. The above research is a significant supplement to the information on the selection of an effective solution for overvoltage protection.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.