Abstract

This paper presents a one rank cuckoo search optimization technique is proposed to design classical PID Controllers for Automatic Generation Control (AGC) of interconnected power systems. This method is proposed based on the original cuckoo search method. It was found in original cuckoo search the convergence speed is comparative lesser in reaching optimal solutions. To overcome the above mentioned problem one rank cuckoo search algorithm has been proposed which uses a bound by best solution technique to get the valid dimension so as to improve the system performance and rate of convergence. The proposed approach is applied to a four area hydro-thermal system in which area-1 and area-2 are steam reheat power plant and area-3 and area-4 are hydro power plant. The controller gains are derived using original cuckoo search and one rank cuckoo search methods. The superiority of the proposed approach is compared with the results obtained with original cuckoo search algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.