Abstract

The situation in which the plan of a new distribution network system should be examined as an electric power company approaches by the multi-machine interconnection of the distributed generators that will be expected in the near future. Then, the authors assumed applying the distribution system which may be adopted as the near future to a system and equipment of the Kansai Electric Power Company, and executed the reliability evaluation concerning the outage energy and voltage sag power that used the real scale model of distribution system by the stochastic reliability evaluation that used the Monte Carlo method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call