Abstract

This study presents a multi-objective problem of the optimal power management of micro-grids, which is based on modified Tribe-PSO. Minimising total cost and emission over a 24 h time horizon are the objective functions in this problem. For the participation of consumers in the management of micro-grids, demand response program is used. The scheduling approach is tested on the IEEE standard distribution network with 33 buses and is compared in two modes: grid-connected and stand-alone. Simulation results show that the presented power and demand scheduling provide a lower operation cost and more efficient utilisation of the renewable energy sources and the demand response programs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.