Abstract

The authors study the matters of justification of the expediency of costs, volumes and terms of the investment-and-construction project implementation, at the same time, the pre-investment stage, at which all the preparatory work, including drawing up the estimate is carried out, is of their main interest. The carried-out analysis proved, that drawing up the estimate, the estimated cost of construction, the same type of an object can differ significantly in different areas, or when using the different equipment. Respectively, the factors which cause such regional distinctions, including various indexation, district coefficients, territorial features of sales terms of projects are revealed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.