Abstract
A study optimising maintenance cost of water borehole schemes in South Eastern states of Nigeria (Abia, Anambra, Ebonyi, Enugu and Imo States) was carried out. Data was collected from 260 boreholes spread across all local government areas in the states. Optimisation results showed that for boreholes (submersible pumps) pumping once per day, the optimal preventive maintenance frequency and resulting savings in cost are 2 and ₦521,076 for Abia; 2 and ₦783,963 for Anambra; 2 and ₦458,242 for Ebonyi; 2 and ₦740,964 for Enugu; 2 and ₦605,187 Imo. For boreholes pumping twice per day, the optimal preventive maintenance frequency and resulting savings in cost are 5 and ₦1,896,301 for Abia; 4 and ₦3,692,655 for Anambra; 5 and ₦786,913 for Ebonyi; 4 and ₦4,187,161 for Enugu; 4 and ₦2,477,609 for Imo; and for boreholes pumping thrice per day; 8 and ₦2,798,330 for Abia; 7 and ₦8,372,862 for Anambra; 7 and ₦6,485,293 for Ebonyi; 10 and ₦4,014,240 for Enugu; 10 and ₦6,021,503 for Imo; with no downtime as opposed to the wasteful current practice of no preventive maintenance with downtime of up to 12 months or more. As a recommendation for a borehole scheme, there should be a check on the type of submersible pump and generator capacity as the choice made directly affects the total operational cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.