Abstract

<jats:p>When withdrawing the route of the expressway Drenovo - Raec, the axis of the road is forced to stretch near or through the mountain massifs. This created a general dilemma, whether to make classical excavations or tunnel constructions in certain locations. Considerations were also made for the decision on high embankments or viaducts. The characteristic location presented in this paper is located between the existing national road and the river Raec. For this location, a comparative analysis of the variant solutions for excavation and tunnel was made and the main parameters that affect the final solution were indicated.</jats:p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.