Abstract

Abstract System-wide performance analysis of manufacturing setup helps a company to stay competitive. This can be done by selecting appropriate performance analysis tool which can save time and effort. As a problem assembly line systems are difficult to completely model and analyze using either of analytical or discrete-event simulation (DES) models. The main objective of this study is to analyze the distinct modeling capabilities of analytical modeling approach and DES approach so as to take their respective primacy for analysis of particular pertinent parameters suitable for Tana Communication (TC assembly line). Both analytical and discrete-event simulation models are developed for TC production process using decomposition approach and AnyLogic software. The results from the two models for work in process, queue cycle time, cycle time and resource utilization have high degree of agreement. By making reassignment of operators from the idle stage to the bottleneck stage the system waiting time and work in process is reduced by 12% and 13% respectively from the proposed model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.