Abstract

The communication infrastructure of the modern Supervisory, Control and Data Acquisition (SCADA) system continues to enlarge, as hybrid High Voltage Direct Current (HVDC)/Alternating Current (AC) networks emerge. A centralized SCADA faces challenges to meet the time requirements of the two different power networks topologies, such as employing the SCADA toolboxes for both grids. This paper presents the modern communication infrastructure and the time requirements of a centralized SCADA for hybrid HVDC/AC network. In addition, a case study of a complete cycle for a unified Weighted Least Squares (WLS) state estimation is tested on a hybrid HVDC/AC transmission network, based on Voltage Source Converter (VSC). The cycle estimates the elapsed times from the sensors up to the SCADA side, including the data acquisition and the WLS processing times. The case study is carried out on the Cigre B4 DC test case network with 43 virtual Remote Terminal Unit (RTU)s installed and 10 data concentrators, all connected through a fiber-based communication network. It is concluded that the time requirements can be fulfilled for a hybrid HVDC/AC network.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.