Abstract
Timeline approach is commonly applied in performance-based design for many big construction projects with difficulties to comply with the prescriptive fire safety codes. Both the Available Safe Egress Time (ASET) and the Required Safe Egress Time (RSET) are estimated and then compared. The common practice will be discussed in this paper and illustrated by referring to an example underground transport station. Fire scenarios with different fire sizes were identified with ASET predicted by fire simulations. Evacuation simulations were carried out to predict RSET. However, the results will be entirely different under a bigger fire, or in buildings with higher occupant loading. The associated problems in this approach commonly adopted in performance-based design in crowded areas pointed out earlier are further confirmed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.