Abstract
This paper describes the commissioning of the new water line (NWL) of the Central wastewater treatment plant in Prague and also the gradual reduction of the existing water line (EWL) loading. Concerning the NWL, the gradual start-up of the process without inoculation will be described. As to the EWL, the presentation describes the adaptation of the EWL operation to the relatively quick reduction of loading to approximately 35%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Water science and technology : a journal of the International Association on Water Pollution Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.