This paper describes the commissioning of the 37-km-long Delivery Tunnel, which forms the last section of the tunnels running from Katse Dam to South Africa as part of the Lesotho Highlands Water Project (LHWP). Commissioning consisted of instrumenting the tunnel, pressure testing, steady state and dynamic flow testing under various flow and operating conditions, checking of filling and dewatering procedures and finally inspection of the Works. Only the main aspects are reported on, as the scope of the work undertaken was massive.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.