Abstract

Many methods of shedding load during peak hours of power system operation have been utilized for efficient use of generation during peak periods. These methods, however, are usually nondynamic, meaning that power for commercial, industrial, or residential appliances are simply turned on or off as needed. As load management customers increase, a variety of load shedding criteria emerges. Some commercial customers in the load management program demand dynamic or routine based power control to ensure the safety of their large equipment such as refrigeration units. The following is a proposal of one such method to accommodate this need.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.