Abstract

This paper aims to analyze the inaccuracies occurred in “Hybrid DE–SQP algorithm for non-convex short term hydrothermal scheduling problem” by S. Sivasubramani and K. Shanti Swarup [Energy Convers. Manage. 52 (2011) 757–761]. The original paper Sivasubramani and Shanti Swarup (2011) has proposed the differential evolution (DE) and sequential quadratic programming (SQP) method to solve the non-convex short term hydrothermal scheduling problem, but the offered solution is not satisfactory, while considering the constraints of reservoir storage volume, the ultimate reservoir storage volumes of hydro-units and the power produced by such units.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.