Abstract

The simultaneous removal of 4-chlorophenol (4-CP) and phenol in lab-scale sequencing batch reactors at different temperatures has been studied. Phenol feed concentration was fixed at 525 mg/L and 4-CP concentration was increased from 105 to 2100 mg/L at a constant hydraulic residence time (HRT) of 10.5 d. Complete phenol and 4-CP biodegradation was achieved during the aerobic stage working with 4-CP concentrations up to 1470 mg/L in the feed. Both 4-CP and phenol specific initial removal rates were strongly affected by 4-CP feed concentration and temperature. Only at the highest temperature tested (35 °C) it was possible to increase the maximum assimilative 4-CP concentration by the biological sludge up to 2100 mg/L, and a significant reduction of the ecotoxicity of the effluents was observed. 4-chlorocatechol (4-CC) was identified as the major intermediate in the aerobic cometabolic 4-CP degradation, being the ecotoxicity of that species substantially lower than that of 4-CP.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call