Abstract
CRM has developed the COMET process in order to produce high quality DRI from iron ore fines and crushed coal. A pilot installation (design capacity : 100 kg DRI/h) is operated at CRM since February 1997. The test results demonstrate that the COMET process enables the continuous production of a highly metallized DRI (> 92 %) with a low gangue content (< 4%) and a low sulphur content (< 0.050 %).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.