Abstract

FREQUENTLY, when automatic load control has been applied to a turbine-generator, regulating performance of the unit has been limited by the ability of the boiler to keep up with the load changes. The purpose of this investigation is to evaluate the improvement in boiler response realized by sending load-regulating intelligence to the boiler as well as to the turbine. The results of a computer simulation study of the problem are verified by a comparison with actual field performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.