Abstract

The use of optimization techniques is well established in forest short-term planning and decision-making. Yet, existing techniques may pose some limitations for tackling with stochastic factors impacting in the execution of forest operations, such as delays, equipment breakdowns and other unexpected events. This paper explores the potential of using optimization techniques in combination with discrete-event simulation (DES) models for planning harvesting and logistics operations acknowledging uncertainty. DES models may be useful for assessing the performance and identifying bottlenecks associated with the execution of the deterministic plans retrieved with optimization techniques, when such stochastic events occur. This paper further presents an approach for the combination of a heuristic and a DES model developed in SIMIO. This approach was used to solve the raw material reception problem (RMRP) at a Portuguese pulp mill. This paper concludes with the analysis of the performance of deterministic schedules for the wood trucks considering uncertainty in their arrival at the mill.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.