Abstract

Electricity consumption forecasting has been always playing a vital role in power system management and planning. Inaccurate prediction may cause wastes of scarce energy resource or electricity shortages. However, forecasting electricity consumption has proven to be a challenging task due to various unstable factors. Especially, China is undergoing a period of economic transition, which highlights this difficulty. This paper proposes a time-varying-weight combining method, i.e. High-order Markov chain based Time-varying Weighted Average (HM-TWA) method to predict the monthly electricity consumption in China. HM-TWA first calculates the in-sample time-varying combining weights by quadratic programming for the individual forecasts. Then it predicts the out-of-sample time-varying adaptive weights through extrapolating these in-sample weights using a high-order Markov chain model. Finally, the combined forecasts can be obtained. In addition, to ensure that the sample data have the same properties as the required forecasts, a reasonable multi-step-ahead forecasting scheme is designed for HM-TWA. The out-of-sample forecasting performance evaluation shows that HM-TWA outperforms the component models and traditional combining methods, and its effectiveness is further verified by comparing it with some other existing models.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.