Abstract
Earliest Deadline First (EDF) and Fixed Priority (FP) scheduling represent the two main dispatching policies within the research domain of real-time systems engineering. Both dispatching policies are now supported by Ada. In this paper the two approaches are combined to maximize the advantages of both schemes. From EDF comes efficiency, from FP predictability. A system model is presented in which a relatively small number of high-integrity tasks are scheduled by FP, with the rest of the tasks being handled via an EDF domain of lower priority. Two aspects of integration are covered in this paper. Firstly, Response-Time Analysis (for FP) and Processor-Demand Analysis (for EDF) are brought together to provide a single analysis framework. Secondly, the programming of systems which combine FP and EDF is addressed within the facilities provided by Ada 2005. Both partitioned and dynamic schemes are covered.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.