Abstract

ABSTRACTThe problem of mixed discrete-continuous task planning for mechanical systems, such as aerial drones or other autonomous units, can be often treated as a sequence of point-to-point trajectories. In this work, the problem of optimal trajectory planning under a combined completion time and energy criterion, for a straight point to point path for a second-order system with quadratic under state (velocity) and control (acceleration) constraints is considered. The solution is obtained and proved to be optimal using the Pontryagin Maximum Principle. Simulation results for different cases are presented and compared with a customary numerical optimal control solver.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.