Abstract

Modernisation of Railways demands performance and safety improvements. The advanced SSI-ATC synergy of the system developed by GEC ALSTHOM ACEC Transport (called ATBL-PLP system) gives an answer to these needs. The synergy is based on the combination of a computerised interlocking system with an up to date Automatic Train Control system, both used for many years on different Railways. The SSI-ATC system provides cab signalling and speed monitoring integrated with a SSI. which allows speed increase, headway and safety improvement, and high speed signalling at optimised costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.