Abstract

In this study, effluent from the biological treatment of wastewater from a resin-producing factory containing recalcitrant compounds was ozonated under different conditions. Afterwards, the biodegradability of the ozonated effluent was studied under anoxic conditions. The post-ozonation of the industrial effluent was performed using a wide range of ozone doses, from 1.8 to 29.5 mg L −1 min −1. After the biological treatment of the ozonated effluent, organic carbon and nitrogen removals from 27 to 97% and from 27 to 80%, respectively, were achieved. The effect of the contact time was studied at a constant ozone dose of 13.0 ± 1.2 mg L −1 min −1 and contact times ranging from 30 to 180 min. In this case, organic carbon removals from 55 to 100% and organic nitrogen removals from 41 to 77% were obtained after biological treatment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.