Abstract

This paper deals with the single-machine, parallel batching, total weighted completion time scheduling problem. A new graph-based formulation of the problem is proposed, where such graph has an exponential number of nodes and arcs. The problem is modeled as an integer linear program on this graph, combining features of a minimum cost flow problem and features of a set-partition problem as well. The continuous relaxation of this integer problem is solved via column generation, providing a very tight lower bound. Two different flavors of column generation are tested, leading to two models with identical performances in terms of bound tightness but in practice very different in terms of running time. A simple and effective rounding strategy applied to the faster model allows to generate heuristic solutions with values within a few percentage points from the optimum. Two different variants of the heuristic rounding procedure are tested; one allows to certify the optimality gap, while the other trades the ability to certify the gap with a greater computational speed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.