Abstract

This paper studies a large-scale scheduling problem in iron and steel industry, called color-coating production scheduling for coils in inventory (CCPSCI). The problem is to select steel coils from those in the coil yard and to create a production schedule so that the productivity and product quality are maximized, while the production cost and other penalties are minimized. A tabu search (TS) algorithm is proposed for this problem. Results on real production instances show that the proposed method is much more effective and efficient than manual scheduling.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call