Abstract
Abstract: West Slope Tunnel's surrounding rock is broken. A positive step method is used in the reconstruction process of collapsed West Slope Tunnel. During tunnel construction process, heavy rain cause a landslide failure of tunnel (Located in DK51+175- DK51+195). The mainly collapsed area is located in the position of DK51+180. According to collapsing, we executed the settlement observation, cross-section deformation detection and upper crack observation.When collapse settlement is basically stable, the collapse is segmented to settle. The previous board of Secondary lining for the collapse need to add steel reinforcement and tunnel collapse cavity backfill C30 concrete. When concrete strength is expected ,it need to be excavated and must keep the core soil. The advanced small pipe is needed to stabilize the soil before the excavation section. In invasion of secondary lining collapse, girdle previous Primary Support and reform Primary Support.. Add I16 steel frame where necessary. We must strengthen the tunnel monitoring to ensure the safety during tunnel construction process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.