Abstract

In the process of the collaborative scheduling of the grid energy-consuming side, the voltage value is low, and the utilization rate of collaborative scheduling resources of the grid energy-consuming side is poor. Therefore, a collaborative scheduling method for the grid energy-consuming side based on a carbon verification data mining algorithm is proposed. Based on the structure of the data management system, the related data structure lookup formula is set to determine the collaborative scheduling task data of the power grid energy side. Under the carbon verification data mining algorithm, the power grid topology structure is constructed, the scheduling target parameters are processed, and the coordinated scheduling of the power grid energy side is realized. The experimental results show that this method can effectively improve the voltage value of each node, and the voltage value of all nodes can reach above the qualified value and improve the utilization rate and energy-saving performance, which has a certain effectiveness.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.