Abstract

AbstractUnder the background of green and low‐carbon transformation of industrial high‐energy‐consuming parks, in order to realize the coordinated development planning of energy and transportation under different peaking capacity requirements, this paper proposes a collaborative optimization model of industrial high‐energy‐consuming parks under green and low‐carbon. Firstly, by studying the energy balance mechanism between industrial load and new energy, an energy topology prior model of energy interaction in the next generation of industrial new energy power grid is constructed. Then, based on the probability characteristics of the equilibrium state of different regions in the high‐energy‐consuming industrial zone, combined with the prior knowledge of industrial load and low‐carbon power system, a collaborative development planning model of high‐energy‐consuming industrial parks is constructed. Finally, the proposed model is simulated. From the simulation results the authors can see the dynamic division model and solution algorithm of energy balance region established in this paper can effectively improve the energy balance ability of power grid, reduce peak shaving demand and use more renewable energy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.