Abstract

Sidoarjo Regency as one of the districts in East Java faces problems in waste management. Currently, Sidoarjo Regency has a high population density and has become an industrial area. This has in increasing the number of waste piles. To reduce the amount of waste pile at the TPA and the source, the government has built an Integrated Waste Management Site (TPST). This study aims to determine how the collaborative process between the government, the public, and the private sector is taking place in the TPST Tambakrejo area. The type of research used in this article is to use a qualitative approach. The results showed that the collaboration process at the TPST Tambakrejo area was up and running even though there were still obstacles. This research concludes that’s collaborative governance has been running optimally. This can be seen from the collaboration aspects of Ansell and Gash

Highlights

  • Human activities are increasing day by day resulting in the resulting pile of waste increases if the amount of landfills continues to rise without good waste management efforts, it will have an impact on environmental problems such as unpleasant odors, bad views, and even solid waste disposal. to waterways or rivers can cause flooding (Tangkasarong, 2017)

  • Waste management in Sidoarjo Regency itself is a serious problem. This is known from various kinds of news in online media such as, from the news, it can be interpreted that every day the volume of waste in Sidoarjo Regency is 1,200 tons, but only 485 tons can be managed by the Environmental and Cleanliness Service of Sidoarjo Regency so that there are around 715 tons of waste that cannot be handled in the community

  • By the news published in Supported, it is stated that a large amount of waste cannot be managed properly, one of which is due to the Final Disposal Site (TPA) in Sidoarjo only has one place, namely in Kupang Village, Jabon District

Read more

Summary

Starting Conditions

Conditions can be interpreted as the beginning of before the collaboration that occurs to how the collaboration process between stakeholders can be established. The motivational factors that cause actors to participate in the collaborative process originate from the inability of each stakeholder to overcome existing problems. Pondok Tjandra Indah is a company engaged in the property business, one of which is located in the Tambakrejo Village area. That the collaboration between the Government and TPST Tambakrejo Area and PT. That the waste is still processed manually, namely from the cart, and sorted by hand This is not proportional to the workload of the people who work at TPST Tambakrejo Area. The factor that becomes an obstacle is the existence of social conflicts with the local village community. Before the establishment of collaboration between stakeholders in handling waste in Tambakrejo Village, there were conflicts such as rejection from residents of 1 hamlet in Tambakrejo Village. After going through a convincing process and finding a solution for the two villages for a year, the TPST Tambakrejo area was built

Facilitative Leadership
Institutional Design
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call