Abstract

This study aims to conceptualize NPD (New Product Development) project uncertainty and investigate how the project uncertainty influences project performance through collaboration and opportunism. An empirical examination is conducted to test such relationships within the scope of Korean manufacturing firms, which are currently engaging in NPD projects with their key partner. Structural equation modeling (SEM) is performed to prove proposed hypotheses. The empirical findings suggested that higher level of project uncertainty leads to collaboration and opportunism and that these two factors come into play in project performance in an opposing way: collaboration serves as a driver of project performance whereas opportunism acts as a barrier against it.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call