Abstract

Abstract Provided that certain conditions are met, Coalbed Methane (CBM) wells have demonstrated the capacity to continue to produce a significant proportion of their peak production rates at very low reservoir pressures. Low reservoir producing pressures require low bottom-hole and surface pressures. Chief among the conditions for high production rates is being able to manage water at low surface pressure. Minimum-net-positive-suction-head considerations limit artificial lift options. The dew point at low pressures allows large volumes of water to move as vapor—rendering mechanical separation equipment ineffective and leaving solids behind at inconvenient places. Temperature changes in buried piping condense water vapor and create both corrosion and pipe-efficiency problems. Low separator pressures preclude easy methods to remove liquid water. This paper addresses the design considerations for these low-pressure operations and related artificial lift systems

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.