Abstract

RECENT EXPANSION in generating capacity of the Hydro-Electric Power Commission of Ontario, together with the policy of centralized control, has necessitated a power-line carrier channel mileage of approximately 16,000 operating over 2,600 circuit miles of the power network. Complexities in operating conditions and requirements, and a limited frequency spectrum, 50–200 kc, require quantitative measurements and consideration of the more important transmission factors in the co-ordination of a power-line carrier network.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.