Abstract

The increased penetration of renewables through converter interfaced generation (CIG) and the associated displacement of synchronous generators (SGs) can significantly reduce system strength. Although some network enhancements, such as the installation of battery energy storage systems (BESS), can partially counterbalance the reduction in strength, current network planning methodologies overlook system strength effects. In this context, this work proposes a new optimization model for co-optimizing investments in network expansions and battery systems to meet, at minimum cost, system strength requirements quantified through short circuit levels (SCL). Recognizing that SCL needs vary on a case-by-case basis, this model incorporates a logistic regression analysis trained on offline time-domain dynamic simulations; this approach effectively correlates SCL with system stability, providing a tailored strategy for each power system. To solve the optimization, we also propose an algorithm to iteratively find the optimal solution for the co-optimized portfolio of new transmission and energy storage investments. Through various case studies, we demonstrate the importance of considering system strength requirements in planning studies with significant penetration of CIG.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.